1977

32 PROJECTS
Most important:
GPL recovery unit
Gasoil recovery unit
Naphtha desulfurizer unit
Distillate dewaxing unit
Refinery optimization studies
Refinery revamping
Melamine plant




(GULF - ITALY)
(ISAB - ITALY)
(ISAB - ITALY)
(GULF - ITALY)
(GULF - ITALY)
(ERG - ITALY)
(MUSA - BRASIL)


1978

38 PROJECTS
Most important:
Iraq refinery
Equator refinery
Topping unit
Refinery optimization studies
Desulfurization unit
Furfurol plant
Urea plant




(TPL - IRAQ)
(TPL - EQUATOR)
(SARNI - ITALY)
(GULF - ITALY)
(API - ITALY)
(INVENTA - SWITZERLAND)
(MUSA - BRASIL)

1979

48 PROJECTS
Most important:
Refinery optimization studies
Gas recovery unit
Ethanolamine plant
Hydrodewaxing unit
Ethanol plant
Maleic anhydride plant




(SARNI - ITALY)
(ERG - ITALY)
(OXITENO - BRASIL)
(ISAB - ITALY)
(INVENTA - SWITZERLAND)
(FTALITAL - ITALY)

1980

40 PROJECTS
Most important:
Ethanol plant
Visbreaker unit
Ammonia plant
Desulfurization unit
Lube plant
Refinery off-sites
Fumaric acid plant
Propane deasphalting unit




(BIOCHEM - VENEZUELA)
(GULF - ITALY)
(TPL - ITALY)
(SARAS - ITALY)
(SNAMPROGETTI - IRAQ)
(IIP - ITALY)
(CIQUINE - BRASIL)
(SNAMPROGETTI - IRAQ)
1981

37 PROJECTS
Most important:
LPG recovery unit
Antibiotic plant
Topping unit
Maleic anhydride recovery unit
Gas plant
Topping revamping
Topping revamping
Gofining revamping



(MOBIL - ITALY)
(TPL - BULGARIA)
(TPL - IRAQ)
(ASI - ITALY)
(TPL - KUWAIT)
(STANIC - ITALY)
(IROM - ITALY)
(MHC) (ISAB - ITALY)
Indietro
Avanti